… still claim that the cement design was not at fault in the Deepwater Horizon Macondo Well blow-out ?
That is, whoever was at fault for accepting the design and its testing – lab testing and in-situ negative pressure testing – the “cement job” failed. The design includes the whole implementation and testing process in my book.
One thought on “Why would Haliburton …”